Roads 2024: Pavement Management Program
Consultation has concluded
Each year, the Engineering and Construction Section of the Transportation and Public Works Department delivers Pavement Management and Capital Works construction programs to renew and improve infrastructure across Halton Hills. Pavement Management has been an annual local resurfacing program since 2003.
Starting in the spring of 2024, select streets will benefit from road resurfacing, where needed. The work will be managed and administered by the Engineering and Construction Section, Transportation and Public Works Department.
Project Summary by Street:
Draper Street, George Street to James Street – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas and storm sewer repairs. Restoration of driveways (full width to the damaged limit), all damaged grassed areas with topsoil and sod. | ||
Evans Place, Mary Street to West End – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Subdrain installation. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas. Restoration of driveways (full driveway boulevards), all damaged grassed areas with topsoil and sod. | ||
James Young Drive, Barber Drive to Argyll Road – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas. Restoration of driveways (full driveway boulevards or full width to the damaged limit), all damaged grassed areas with topsoil and sod. | ||
Lorne Street, Charles Street to Draper Street – Resurfacing | Full depth asphalt removal, curb and sidewalk repairs in pre-identified areas, storm sewer repairs and full width asphalt resurfacing. Restoration of driveways (full width to the damaged limit) all damaged grassed areas with topsoil and sod. | ||
Mary Street, Princess Anne Drive to Cleaveholm Drive – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas, storm sewer repairs and full width asphalt resurfacing. Restoration of driveways (full driveway boulevards) all damaged grassed areas with topsoil and sod. | ||
McGilvray Crescent, Delrex Boulevard to McGilvray Crescent – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas and full width asphalt resurfacing. Restoration of driveways (full driveway boulevards) all damaged grassed areas with topsoil and sod. | ||
Moultrey Crescent, Duncan Drive to Duncan Drive – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas, storm sewer repairs and full width asphalt resurfacing. Restoration of driveways (full driveway boulevards) all damaged grassed areas with topsoil and sod. | ||
Smith Drive, Mountainview Road S to Barber Drive – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas and full width asphalt resurfacing. Restoration of driveways (full driveway boulevards or full width to the damaged limit) all damaged grassed areas with topsoil and sod. | ||
William Street, Charles Street to Market – Minor Reconstruction | Full depth asphalt removal, addition of mountable curb and full width asphalt resurfacing. Restoration of driveways (full driveway boulevards or full width to the damaged limit) all damaged grassed areas with topsoil and sod. | ||
Harold Street, Princess Anne Drive to End – Resurfacing | Mill (remove) top asphalt lift, base asphalt repairs as required. Repave asphalt full width of road. Curb and sidewalk repairs in pre-identified areas, storm sewer repairs and full width asphalt resurfacing. Restoration of driveways (full driveway boulevards) all damaged grassed areas with topsoil and sod. | ||
Fourth Line, Highway 7 to 1.2 km south – Resurfacing | Cold-in-place asphalt stabilization, pave asphalt full width of road, and re-establish gravel shoulders. Restoration of driveways (full width to the damaged limit) all damaged grassed areas with topsoil and sod or seed. |
Ask Town staff about roads resurfacing in Halton Hills. Your question(s) will be answered in five business days.