Share Calvert Dale Parkette Playground Replacement on FacebookShare Calvert Dale Parkette Playground Replacement on TwitterShare Calvert Dale Parkette Playground Replacement on LinkedinEmail Calvert Dale Parkette Playground Replacement link
Consultation has concluded
The Project is now complete!
Thank you for being a part of the process!
The Town of Halton Hills Recreation and Parks Department is planning to replace the playground at Calvert Dale Parkette this fall, along with some tree planting and naturalization.
Calvert Dale Parkette Calvert Dale is a 0.17-hectare (0.44-acre) parkette located in Georgetown North, at 17 Cotswold Court, just south of the Georgetown Mall.
The final design strikes a balance between toddler, junior, and senior user needs, offering a range of developmentally appropriate activities. Our anticipated timeline is for park construction to be completed by Summer 2024.
Based on your feedback:
Brighter colors were added to the design.
A belt swing and tot swing were switched out for the basket swing.
New benches will replace existing benches on-site.
A xylophone was requested for a musical component, and the Lemonade Stand was chosen for the stand-alone panel.
The Canyon Climber was preferred for the climber, and the Crossway Climber was preferred over the Loopz Rings.
The proposed safety surfacing consists of engineered wood fiber, meeting CSA standards for accessibility.
Other site upgrades include:
New park signage.
Additional trees.
Naturalizing the edge of the park beside the mall with trees, shrubs, and flowers.
Three new park benches.
What's next?
Construction will commence in Summer 2024 with the removal and replacement of the playground, Other site features will be implemented in Fall 2024 or Spring of 2025.
The Project is now complete!
Thank you for being a part of the process!
The Town of Halton Hills Recreation and Parks Department is planning to replace the playground at Calvert Dale Parkette this fall, along with some tree planting and naturalization.
Calvert Dale Parkette Calvert Dale is a 0.17-hectare (0.44-acre) parkette located in Georgetown North, at 17 Cotswold Court, just south of the Georgetown Mall.
The final design strikes a balance between toddler, junior, and senior user needs, offering a range of developmentally appropriate activities. Our anticipated timeline is for park construction to be completed by Summer 2024.
Based on your feedback:
Brighter colors were added to the design.
A belt swing and tot swing were switched out for the basket swing.
New benches will replace existing benches on-site.
A xylophone was requested for a musical component, and the Lemonade Stand was chosen for the stand-alone panel.
The Canyon Climber was preferred for the climber, and the Crossway Climber was preferred over the Loopz Rings.
The proposed safety surfacing consists of engineered wood fiber, meeting CSA standards for accessibility.
Other site upgrades include:
New park signage.
Additional trees.
Naturalizing the edge of the park beside the mall with trees, shrubs, and flowers.
Three new park benches.
What's next?
Construction will commence in Summer 2024 with the removal and replacement of the playground, Other site features will be implemented in Fall 2024 or Spring of 2025.
The Town Of Halton Hills Recreation and Parks Department is planning the replacement of the playground at Calvert Dale Parkette this fall, along with some tree planting and naturalization.
Staff have developed a preliminary design and are seeking feedback from the neighborhood on the proposed design.
Consultation has concluded
Share Calvert Dale Park Survey on FacebookShare Calvert Dale Park Survey on TwitterShare Calvert Dale Park Survey on LinkedinEmail Calvert Dale Park Survey link